REGULATORY ORDINANCES

For communities that determine through a transparent, community-led process that data center projects can move forward if they meet strong public-interest standards, policymakers can use these tools to make data center development contingent on a range of substantive, enforceable requirements, standards, and protections. These tools can address issues including land use and siting, electricity and water use, environmental impacts, infrastructure costs, community and economic benefits, worker protections, transparency, and ongoing compliance and enforcement.

These tools are most effective when they are supported by clear legal authority, transparency, regular reporting, and enforceable compliance mechanisms. 

Jurisdictions should confirm their authority to adopt each provision, make relevant project commitments and impacts publicly available, establish procedures to monitor compliance, and provide appropriate remedies for noncompliance. Requirements should be incorporated into permits, approvals, development agreements, incentive agreements, Community Benefits Agreements, Project Labor Agreements, or other enforceable instruments, as appropriate, and should identify applicable reporting, monitoring, corrective action, and enforcement mechanisms. See the Legal Authority and Preemption and Transparency sections of this Guide.

These approaches give communities meaningful authority to determine under what conditions data center development is in the public interest.

REGULATORY ORDINANCES



SECTION 1. OVERVIEW

The [JURISDICTION] finds that data centers present widespread impacts not adequately addressed by conventional commercial or industrial classifications, particularly with respect to energy demand, water consumption, air quality, greenhouse gas (GHG) emissions reductions targets, land use, and infrastructure cost-shifting, community impacts, public service capacity, and the potential to bear costs associated with new infrastructure demand. Clear, predictable, and publicly available permitting standards serve the interests of both the community and the industry.

The Ordinance is intended to ensure that the costs associated with data center development are borne by the applicants and operators responsible for generating those impacts and do not shift unreasonable costs to existing residents, ratepayers, taxpayers, or public institutions.  

This Ordinance governs all data centers that are proposed, constructed, expanded or materially altered within [JURISDICTION]. This Ordinance supplements applicable federal, state, and other local requirements.  Where legally permissible, where a conflict exists, the more protective standard applies.

For the purpose of this [ACT/ORDINANCE] the following terms shall be defined:

Please select any relevant definitions from the following list.

SECTION 2. DEFINITIONS

Agency
  • A state agency, authority, department, board, commission, division, public benefit corporation, or other separate unit of state government created or established by law, including any unit thereof;
  • A county, city, village, township, district, municipal corporation, or other political subdivision, including any unit thereof;
  • An employee, officer, or elected or appointed official of any entity described in subparagraphs (i) or (ii) of this paragraph, while acting in their official capacity; or
  • Anyone acting on behalf of any entity described in the above.
Applicant

Any person or organization applying for approval under this ordinance and/or any person or entity acting on its behalf or exercising control over the proposed data center project.

Auxiliary Data Center [or: Ancillary Data Center]

A smaller, networked computer server facility operated for the private, internal use of a single organization, that is subordinate to and accessory to the organization's primary use of the building or site. An Auxiliary Data Center Facility is not a stand-alone commercial data center and shall not exceed 20% of the total building square footage on the project site and shall have a maximum design IT load capacity of 9 megawatts.

Battery Energy Storage Systems (BESS)

Commercially available electrochemical system capable of storing and discharging electrical energy, including lithium-ion, flow battery, and comparable technologies meeting applicable safety standards

Clean Energy
  • Energy derived from sources that, during operation, produce zero direct greenhouse gas emissions, and whose life-cycle assessed emissions do not exceed 50 grams of carbon dioxide equivalent per kilowatt-hour. This is limited to electricity generated from renewable sources, such as solar, wind, geothermal, hydroelectric, and other qualifying low-carbon energy sources.
  • Clean Energy excludes nuclear, small modular nuclear reactors, biomass, fossil fuel resources such as methane gas, oil, diesel, and propane.
Clean Energy Data Center Tariff

A tariff applicable to data centers which allows data centers to fully pay all costs, bundled into their utility rates, associated with the addition of Qualifying Energy equivalent to any portion or the entirety of their load.

Community Benefits Agreement (CBA)

A legally binding agreement between a Developer and representative community organizations, labor unions, and other community stakeholders that establishes specific, enforceable benefits and commitments relating to a Project. A Community Benefits Agreement is distinct from a collective bargaining agreement, which governs terms and conditions of employment between a union and an employer.

Community Benefits Ordinance (CBO)

Any ordinance and regulations, guidelines, or implementing requirements adopted pursuant to it that establish community, workforce, labor, environmental, or other public benefits and requirements applicable to a Covered Data Center or Project.

Community exposure points

Locations where vulnerable members of the public, including children, the elderly, those with underlying health conditions, and those who may lack access to healthcare, are likely to spend time. These locations include but are not limited to schools, day care centers, nursing homes, hospitals, health clinics, detention centers, homeless shelters, places of religious worship, parks, playgrounds, and community centers.

Conditional Use Permit (CUP) or Special Use Permit (SUP)

The discretionary permit required to establish or operate a Data center under this Ordinance.

Data Center or facility

Any facility, or group of facilities under common ownership or operational control, with the primary use to house computer servers, data storage systems, networking equipment, or associated infrastructure for data processing, web hosting, streaming services, or computational tasks [OPTIONAL: “that uses a nameplate capacity of [#] Megawatts or greater of electricity per day”] [OPTIONAL: “that has a gross floor area of [100,000] square feet or more”] [OPTIONAL: “that is expected to require an investment of $[75 million] or more].

Developer

Any individual, corporation, limited liability company, joint venture, partnership, affiliate, or other entity that proposes, owns, operates, or seeks approval for a data center, including any agent or other individual acting on their behalf.

Direct cumulative impacts

Environmental hazards and other chemical and non-chemical stressors that have the potential to negatively impact human health, well-being, and quality of life in their immediate area.

Distributed capacity

Any combination of energy resources on the distribution grid that can be aggregated to meet a utility energy capacity requirement, including energy storage, distributed generation, retail demand response programs, managed electric vehicle charging, smart thermostats and appliances, energy efficiency, hourly matching mechanisms, dynamic load management, virtual power plants that combine the resources listed in this section, or such other energy resources as are determined by a public utility commission or other regulatory agency to offer reliable system capacity.

Emergency Generator

A combustion-powered backup generator used solely during unplanned utility outages, major grid emergencies, or required testing, never as a routine or planned power source

End user

The company that will occupy, lease or contract for computing capacity at an AI data center.

Environmental justice area
  • Any contiguous area made up of one or more census block groups, as determined in accordance with the most recent United States Census or American Community Survey, in which:
    • At least 35 percent of the households have an income less than or equal to two times the federal poverty level
    • At least 40 percent of individuals list their racial status Black or African American; American Indian or Alaska Native; Asian; Native Hawaiian or Other Pacific Islander; or Middle Eastern or North African, or list their ethnicity as Hispanic or Latino;
    • At least 40 percent of the households have limited English proficiency; or
    • At least 35 percent of the people over the age of 25 have not earned a high school diploma;
  • Any contiguous area made up of one or more census block groups which fall at or above the 90th percentile for susceptibility to environmental pollution as determined in accordance with the United States Environmental Protection Agency EJSCREEN demographic index or United States Environmental Protection Agency EJSCREEN supplemental demographic index;
  • Any area within the lands of a federally recognized Tribe; and
  • Any other area identified or approved by [State environmental protection agency] having a history of environmental disparities, vulnerability to environmental degradation, disproportionate health impacts, or lack of public participation.
Existing Facility

A Data Center lawfully in commercial operation prior to the effective date of this Ordinance

Grid Impact Study

A technical assessment evaluating the effects of a proposed Data Center on electric transmission and distribution systems, including projected demand, infrastructure requirements, reliability impacts, and associated costs.

Impacted community

Residents, property owners, renters, businesses and business owners located within [10] miles of the data center boundary; every household served by a drinking water system, aquifer, or watershed that a covered AI data center would draw from or discharge into; and every retail customer of the electric utility serving the covered project.

Local Resident

A person whose primary residence is located within a defined jurisdiction, labor market area, or set number of miles from the Project as defined by the Jurisdiction.

Low-Income Resident

A Local Resident whose household income does not exceed [(80) percent of area median income] or another locally established income standard.

Nondisclosure agreement (NDA)

Any agreement, provision, clause, or contractual term that has the purpose or effect of any of the following:

  • Restricting an agency from disclosing information about a potential data center to members of the public, including but not limited to information about the proposed data center’s location, siting, construction, energy demand and type, water usage, utility interconnection, and other potential community and environmental impacts from the data center;
  • Deeming that the construction of a data center or other information about a data center is confidential;
  • Prohibiting a party to the agreement from disclosing, discussing, describing, or commenting on the proposed construction, modification or expansion of a data center; or
  • Requiring advance approval from the developer prior to an agency’s disclosure of information about a data center.
Operator

The person or organization responsible for day-to-day facility management

Owner

The person or organization that owns, controls, or has legal or financial interest in the facility or property on which the facility is located, including any parent company or controlling entity.

Per- and Polyfluoroalkyl Substances (PFAS)

Widely used, long lasting chemicals, components of which break down very slowly over time.

Permanent Employee

An individual employed to perform ongoing operational, maintenance, technical, administrative, security, or other work at or for a Covered Data Center, excluding temporary construction employment.

Permitting Authority

The issuing body of a discretionary permit required to establish or operate a data center under this Ordinance.

Potable Water

Water that comes from surface and ground sources and is treated to levels that meet state and federal standards for consumption.

Power Usage Effectiveness (PUE)

The ratio of a facility’s total energy consumption to the energy consumed by its IT equipment alone. A PUE of 1.0 represents perfect efficiency

Pre-Apprenticeship Program

A program or training model designed to prepare individuals for entry into a Registered Apprenticeship program by providing foundational skills, industry-recognized training, career counseling, and other services, and that is operated in accordance with applicable federal or state standards or is formally connected to, supported by, or recognized by a Registered Apprenticeship program.

Prevailing Wage

The wage and fringe benefit rates determined to be prevailing under relevant federal, state, or local prevailing wage law or determination for the applicable construction classification and geographic area. Where applicable law requires different rates for different classifications, employers, contractors, subcontractors, or types of work, the rate applicable to the work performed shall apply.

Project

The development, construction, expansion, substantial renovation, or operation of a Covered Data Center.

Project Labor Agreement (PLA)

A pre-hire collective bargaining agreement governing labor relations for covered construction work on a Covered Data Center and applicable to all covered contractors and subcontractors.

Qualifying Energy
  • Resources of the following types:
    • verifiable new clean energy;
    • behind-the-meter energy storage that is co-located on-site or immediately adjacent to the data center; or
    • distributed capacity that is additional, deliverable to the data center and determined by a public utility commission to meet emissions, reliability, and public interest objectives comparable to those met by the energy described in paragraphs (i) and (ii) of this subsection.
  • and procured from any combination of:
    • generation resources directly owned by the developer of the data center; or
    • a power purchase agreement or other comparable legal mechanism that a public utility commission determines is sufficient for ensuring the new clean energy is directly attributable to all or part of the data center’s covered electrical load commitment; or
    • a Clean Energy Data Center Tariff, developed by the utility at the discretion of and approved by a public utility commission as meeting the requirements of this section.
Registered Apprenticeship

An apprenticeship program registered and approved by the U.S. Department of Labor or a State Apprenticeship Agency pursuant to applicable federal or state law and standards, through which apprentices receive structured, paid on-the-job training and related technical instruction in an occupation recognized as an apprenticeship occupation.

Special Water Variance

An official exception or temporary waiver granted by a municipal, state, or federal agency that allows a property owner or public water system to deviate from standard water conservation rules or drinking water quality limits

Subsidies

Sales and use tax exemptions, corporate income taxes exemptions, personal income tax divisions, utility tax exemptions, expedited land use or environmental permits, or other financial or land-use benefits an AI data center may receive at the state or local level.

Verifiable New Clean Energy

Incremental, deliverable clean energy generation that, as determined by a public utility commission, is additional to existing clean energy available or committed to the State at the time a developer seeks approval to build or expand the data center, produces renewable energy credits that are retired on behalf of the data center, and is intended to serve, in whole or part, electrical load of the data center proposed to be built or expanded.

Water Usage Effectiveness (WUE)

The ratio of annual water consumed by facility support systems (primarily cooling) to the energy consumed by its IT equipment. Lower values represent less water used per unit of computing work performed.

Waterless Cooling

Cooling systems that do not consume water through evaporation, blowdown, or other use. This includes closed-loop cooling systems that continuously recirculate coolant without consumptive water use, including, but is not limited to, direct liquid cooling, immersion cooling, and rear door heat exchanger.

SECTION [#]. ENERGY REFORM

SECTION [#]. PERMITTING AND ZONING

SECTION [#]. POLLUTION CONTROL

SECTION [#]. TRANSPARENCY

SECTION [#]. SUBSIDY REPEAL

SECTION [#]. WATER USAGE

SECTION [#]. Labor Standards, Workforce Development, and Good Jobs

SECTION [#]. Community Benefits

SECTION [#]. DECOMMISSIONING

SECTION [#]. SEVERABILITY

If any provision, section, or clause of this Ordinance is for any reason held invalid or unconstitutional by a court, it does not affect the validity of the remaining portions of this Ordinance. [JURISDICTION] declares that it would have adopted each provision of this Ordinance independently from any other.

SECTION [#]. EFFECTIVE DATE

[#].01 Effective Date 

This Ordinance shall be effective on [DATE] and shall apply to all Data Centers proposed, constructed, or expanded after that date.

[#].02 Vested Rights 

Existing Operating Facilities 

An Existing Facility is not required to obtain a [CUP] and may continue to operate at its IT load capacity. The facility will become subject to this ordinance upon: 1) Any material alteration,  2) expiration or renewal of any existing land use entitlement or, 3) the compliance deadlines established in the following subsection. 

Compliance Schedule for Existing Facilities 

Existing Facilities shall come into compliance with the following provisions of this Ordinance according to the schedule below, regardless of whether a material alteration occurs:

  • Reporting and Monitoring (Section VI): Existing Facilities should begin submitting Annual Compliance Reports beginning with the first full calendar year after the effective date of this Ordinance; 

  • Clean Energy and Efficiency Standards: Existing facilities should achieve the 50% clean energy threshold within 2 years of the effective date and 100% clean energy within 4 years of the effective date; 

  • On-Site Energy Storage: Existing Facilities should install a compliant Battery Energy Storage System within 4 years of the effective date; 

  • Water Standards: Existing facilities using water-consumptive cooling as of the effective data should submit a Water Conservation Plan within 6 months of the effective date and should fully transition to Waterless Cooling within 3 years of the effective date; and, 

  • Decommissioning: (Section VII): Existing facilities should submit a Decommissioning Plan within 1 year of the effective date.

Nothing in this section shall be construed to expand or create vested rights beyond those recognized under applicable law.

Facilities Approved but Not Yet Operating 

A Data Center that has obtained a valid permit prior to the effective date of this ordinance, but has not yet begun operations, has 18 months from the effective date to commence operations in compliance with this Ordinance.

SECTION [#]. PERIODIC REVIEW

[JURISDICTION] shall review the implementation and effectiveness of this Ordinance at least every [#] years, including compliance records, environmental impacts, infrastructure costs, public complaints, enforcement actions, and cumulative impacts from data centers.

The review shall include an opportunity for public comment and shall identify any amendments necessary to protect public health, safety, environmental quality, and community interests.

SECTION [#]. LEGAL AUTHORITY AND STATE PREEMPTION